Energy Symbol ColorEnergy Symbol White
HAKKIMIZDA

ABOUT KALYON ENERJİ

“We produce clean energy for a self-sufficient world in energy. Guided by sustainability principles and development goals, we are working with dedication to continuous improvement and make impact investments.”

Kalyon Enerji, emerged from Kalyon İnşaat, the locomotive company operating under the umbrella of Kalyon Holding, during the realization process of 1,350 MWp Karapınar YEKA GES-1 project and 1,000 MW YEKA RES-1 project of which the tenders were made in 2016 and the contracts signed in 2017 and reached to its current shareholding structure in 2022 after the acquisition of 50% of the shares by International Holding Company (IHC) from UAE.

By approaching the escalating energy demands of Türkiye and the world with a sustainability vision, taking into account both the country's targets and global needs, making our impact investments in clean energy, we play a prominent role in the fight against climate change.

Our top priority is to make energy accessible to everyone, including disadvantaged groups, by using clean and renewable energy sources. To this end, we focus our investments on solar and wind power plants. We also invest in energy storage facilities so that renewable energy can become widespread and a part of our daily lives.
Güneş Enerjisi
SOLAR
POWER PLANTS
G24 Karapınar SPP
Karapınar SPP
Bor SPP
Viranşehir SPP
Gaziantep SPP
Total
2240,5 MW
Rüzgar Enerjisi
WIND
POWER PLANTS
Bilecik WPPAnkara WPPElazığ WPPTrabzon WPPBayburt WPP
Total
227,7 MW
Total
2468.2 MW

OUR PARTNERSHIP STRUCTURE

As of August 2022, 50% of our company belongs to the International Energy Holding (IEH), a subsidiary of the International Holding Company (IHC), one of the largest investment companies in the United Arab Emirates and the Gulf Region, and the remaining 50% belongs to Kalyon İnşaat, which is one of the leading construction companies in Türkiye, and boasts several important projects.

VISION AND MISSION

VISION

In the light of sustainability principles, our goal is to transition from achieving net zero to making positive contributions to carbon and water footprints, and to nature throughout our entire supply chain. Leveraging our renewable energy projects developed both locally and internationally, along with our global partnerships, we aim to be a leading energy company that sets an example worldwide, while simultaneously creating employment opportunities in various sectors and contributing to economic growth.

MISSION

In addition to actively contributing to economic growth, our environmental, social, and corporate governance strategy focuses on ensuring a clean energy supply for all and transitioning from net zero to a positive contribution to the global warming equation.

OUR VALUES

Ethical and Transparent
Equality and Inclusion
Honest and Principled
Respectful to Nature and Society
Prioritizing Cultural Values
Focused on Sustainable Development

WHERE WE ARE

BİLECİK
Bilecik WPP
71,4 MWm / 70 MWe
RüzgarRüzgar
RüzgarRüzgar
ANKARA
Ankara WPP
50,4 MWm / 50 MWe
RüzgarRüzgar
RüzgarRüzgar
TRABZON
Trabzon WPP
21,3 MWm / 20 MWe
RüzgarRüzgar
RüzgarRüzgar
BAYBURT
Bayburt WPP
42,6 MWm / 40 MWe
RüzgarRüzgar
RüzgarRüzgar
ELAZIĞ
Elazığ WPP
42 MWm / 40 MWe
RüzgarRüzgar
RüzgarRüzgar
ŞANLIURFA
Viranşehir SPP
195 MWp / 150 Mwe
Güneş Enerjisi
GAZİANTEP
Gaziantep SPP
65 MWp / 50 Mwe
Güneş Enerjisi
NİĞDE
Bor SPP
130 MWp / 100 Mwe
Güneş Enerjisi
KONYA
Karapınar SPP
1.350 MWp / 1.000 MWe
Güneş Enerjisi
NeredeyizNeredeyiz

OUR PROJECTS AND FACILITIES

SOLAR POWER PLANTS
Karapınar YEKA-1 SPP
Location
Konya / Karapınar
Installed Capacity (MWp/MWe)
1.350 / 1.000
Status
COMMERCIAL OPERATION
G4 Bor-3 SPP
Location
Niğde / Bor
Installed Capacity (MWp/MWe)
130 / 100
Status
COMMERCIAL OPERATION
G4 Viranşehir-5,7,8 SPP
Location
Şanlıurfa / Viranşehir
Installed Capacity (MWp/MWe)
195 / 150
Status
COMMERCIAL OPERATION
G3 Gaziantep-1-1,2-1,3-1 SPP
Location
Gaziantep / Şahinbey
Installed Capacity (MWp/MWe)
65 / 50
Status
COMMERCIAL OPERATION
G24 Karapınar SPP
Location
Konya / Karapınar
Installed Capacity (MWp/MWe)
500,5 / 385
Status
UNDER CONSTRUCTION
WIND POWER PLANTS
R3 Ankara-2-1 WPP
Location
Ankara / Şereflikoçhisar
Installed Capacity (MWm/MWe)
50,4 / 50
Status
COMMERCIAL OPERATION
R3 Bilecik-6 WPP
Location
Bilecik / Söğüt
Eskişehir / Tepebaşı
Installed Capacity (MWm/MWe)
71,4 / 70
Status
COMMERCIAL OPERATION
R3 Elazığ-1 WPP
Location
Elazığ / Maden
Installed Capacity (MWm/MWe)
42 / 40
Status
COMMERCIAL OPERATION
R3 Bayburt-5 WPP
Location
Bayburt / Aydıntepe
Installed Capacity (MWm/MWe)
42,6 / 40
Status
COMMERCIAL OPERATION
R3 Trabzon-1 WPP
Location
Trabzon / Çaykara
Bayburt / Merkez
Installed Capacity (MWm/MWe)
21,3 / 20
Status
COMMERCIAL OPERATION
Contact Us
You can view our contact information
or contact us by filling out the form.
© 2025 Kalyon Enerji. All rights reserved. Website by Mocha
İletişim Hattı
0216 000 00 00